Boulder Power Outage Disrupts Atomic Clock, NIST Assures Time Integrity

TL;DR Summary
A power outage caused by preemptive shutdowns in Boulder temporarily affected the NIST F-4 atomic clock, resulting in a minimal 4 microsecond drift in time measurement, but the system's redundancies ensure no significant impact on global timekeeping or critical industries.
Reading Insights
Total Reads
0
Unique Readers
2
Time Saved
2 min
vs 3 min read
Condensed
91%
427 → 40 words
Want the full story? Read the original article
Read on CBS News