"First Turbine Shipped from New Bedford as Inter-Array Cable Laying Begins at US Offshore Wind Farm"

TL;DR Summary
Vineyard Wind, the first commercial-scale offshore wind farm in the US, has shipped out its first GE Haliade-X Wind Turbine Generator (WTG) from New Bedford to its home location over 30 miles from Cape Cod. The transportation of the turbine components over open water is a significant milestone for the offshore wind industry. Vineyard Wind aims to power over 400,000 homes and businesses in Massachusetts, generate 3,600 jobs, save consumers $1.4 billion over 20 years, and reduce carbon emissions by 1.6 million metric tons per year.
- Vineyard Wind Ships Out First Turbine From New Bedford gCaptain
- Inter-Array Cable Laying Work Kicks Off at First Large-Scale US Offshore Wind Farm | Offshore Wind Offshore WIND
- Wind industry comes to New London theday.com
- Inter-array cable laying work begins at first large-scale US offshore wind farm Offshore Energy
- Inter-Array Cable Laying Work Begins at First Large-Scale US Offshore Wind Farm | Offshore Wind Offshore WIND
- View Full Coverage on Google News
Reading Insights
Total Reads
0
Unique Readers
0
Time Saved
2 min
vs 3 min read
Condensed
79%
413 → 86 words
Want the full story? Read the original article
Read on gCaptain