"Challenges and Impacts of Washington Bridge Issues on Businesses and Infrastructure"

TL;DR Summary
Inspection reports spanning from 2014 to 2023 reveal that the Washington Bridge has faced accessibility challenges, including pigeon debris and design limitations, hindering thorough examinations despite issues such as rusting and cracking. The bridge was rated in poor condition but deemed safe until broken rods were discovered in December, prompting its shutdown and impending demolition. U.S. Transportation Secretary Pete Buttigieg and state leaders have expressed concerns about the inspection process, with an independent audit underway to investigate further.
- Washington Bridge inspections show lack of access due to 'pigeon debris,' other issues Turn to 10
- 100 days later, businesses still feeling impacts of I-195 bridge closure WPRI.com
- Hundreds of structurally deficient bridges throughout Mass. WCVB Boston
- Business owners react to I-195 Washington Bridge demolition announcement The Brown Daily Herald
- Washington Bridge: EP businesses 'can't be doing this for three, four or five years' WLNE-TV (ABC6)
Reading Insights
Total Reads
0
Unique Readers
1
Time Saved
2 min
vs 3 min read
Condensed
83%
446 → 78 words
Want the full story? Read the original article
Read on Turn to 10