Washington Bridge Westbound Closed by Rhode Island Department of Transportation

TL;DR Summary
The Rhode Island Department of Transportation has announced the closure of the westbound side of the Washington Bridge due to a critical failure of some original bridge components. The closure will be immediate and last for two to three weeks while a bypass is developed to divert traffic. Afterward, reconstruction of the critical parts of the bridge will take at least three months. Residents are urged to use detours during this time.
Topics:nation#closure#construction#rhode-island-department-of-transportation#traffic-diversion#transportation#washington-bridge
Reading Insights
Total Reads
0
Unique Readers
1
Time Saved
1 min
vs 2 min read
Condensed
64%
202 → 72 words
Want the full story? Read the original article
Read on Turn to 10