"Washington Bridge Construction Exposes Broken Rods, East Providence Grapples with Traffic and Police Manage Angry Drivers: Latest Updates"

Internal emails obtained by Target 12 reveal that engineers at RIDOT acknowledged the section of the Washington Bridge that led to its sudden closure had been hard to see until construction work made it "noticeable." The emails also show state officials' frantic efforts to address the crisis, with concerns raised about the deterioration of rods holding up the bridge. RIDOT's public statements about the bridge failure's cause contrast with internal analysis, prompting a forensic investigation. Additionally, frustration is evident in the emails over the inability to secure emergency federal funding due to the bridge not collapsing or being damaged by a natural disaster.
- RIDOT emails: Broken rods on Washington Bridge ‘more exposed’ due to construction WPRI.com
- East Providence works to manage traffic congestion caused by Washington Bridge closure Turn to 10
- East Providence police deal with angry drivers, ask for patience amid Washington Bridge closure WLNE-TV (ABC6)
- McKee sends top aide to RIDOT to monitor response to Washington Bridge investigation. What to know. The Providence Journal
- Federal Investigator on RIDOT Washington Bridge Failure Also Investigated 6/10 Contamination GoLocalProv
Reading Insights
0
1
3 min
vs 4 min read
87%
766 → 103 words
Want the full story? Read the original article
Read on WPRI.com