Rhode Island's Washington Bridge Bypass Lanes Open Ahead of Schedule

TL;DR Summary
The I-195 West "bypass lanes" on the Washington Bridge in Rhode Island have opened ahead of schedule, allowing two lanes of travel in each direction on the eastbound side of the bridge. Most ramps that were closed will reopen, except for a few. The westbound side of the bridge remains closed for emergency repairs, with only emergency vehicles allowed to use it. The bypass lanes are expected to alleviate congestion but delays may still occur. Recommended detours and alternate routes are provided, and ferry service between Bristol and Providence is set to open soon.
Topics:nation#bypass-lanes#i-195-west#rhode-island-department-of-transportation#traffic#transportation#washington-bridge
- I-195 West ‘bypass lanes’ open ahead of schedule WPRI.com
- Bypass lanes open on the Washington Bridge Turn to 10
- Is it faster to bike or drive during the Washington Bridge closure? We held a race. The Providence Journal
- Ferry service between Bristol and Providence expected to start Monday WLNE-TV (ABC6)
- BREAKING: Rhode Island Opens I-195 West Bypass Lanes on Washington Bridge Newport Buzz
Reading Insights
Total Reads
0
Unique Readers
1
Time Saved
2 min
vs 3 min read
Condensed
78%
433 → 94 words
Want the full story? Read the original article
Read on WPRI.com