Emergency Bridge Joint Repair Shuts Down I-5 South in Portland

1 min read
Source: Fox 12 Oregon
Emergency Bridge Joint Repair Shuts Down I-5 South in Portland
Photo: Fox 12 Oregon
TL;DR Summary

All southbound lanes on Interstate 5 in Portland will be closed for emergency repairs due to a failed bridge joint, diverting traffic to Interstate 405 and the Fremont Bridge. The joint, located on a stretch of the freeway over Greeley Boulevard, has caused concrete to crack and drop onto the ground, creating a large pothole. The closure is expected to last until midnight for repairs by the Oregon Department of Transportation.

Share this article

Reading Insights

Total Reads

0

Unique Readers

5

Time Saved

1 min

vs 1 min read

Condensed

64%

19771 words

Want the full story? Read the original article

Read on Fox 12 Oregon