"Ravenel Bridge Reopens After Container Ship Incident"

TL;DR Summary
The Ravenel Bridge in Charleston briefly shut down on Wednesday after a cargo ship lost propulsion. The bridge was closed at 12:36 p.m. and reopened at 12:51 p.m. after the ship was cleared from the harbor. An investigation is underway.
- Ravenel Bridge in Charleston reopens after brief shutdown WYFF4 Greenville
- Container ship stuck on ‘full throttle’ prompted temporary Ravenel Bridge closure Live 5 News WCSC
- Adrift vessel causes Ravenel Bridge to temporarily close in all directions: Officials ABC NEWS 4
- Ravenel Bridge reopens after temporary closing | News The Post and Courier
- “Out of control” container ship prompts temporary closure of Ravenel Bridge; remains anchored outside Charleston Harbor WCBD News 2
Reading Insights
Total Reads
0
Unique Readers
0
Time Saved
1 min
vs 2 min read
Condensed
83%
242 → 40 words
Want the full story? Read the original article
Read on WYFF4 Greenville